|
Product Details:
Payment & Shipping Terms:
|
Material: | UPVC/CPVC/OPVC/PE/PP/MB/CORBON | Model: | Heating Mixer,heating Cooling Mixer, Cooling Mixer |
---|---|---|---|
Mixer Model: | BS-SRL-Z300/600 | Heating Mixermotor Power: | 40-55Kw |
Cooling Mixer Motor Power: | 7.5Kw | Inverter Brand: | ABB |
Voltage: | 380V/3phase/50HZ(optinal) | Warranty: | 1 Year |
Certification: | CE | ||
Highlight: | industrial mixer machine,high speed mixer machine |
Plastic mixing machine high speed PVC/PE/PP 300/600 heating cooling mixer
Application:
Plastic mixer is one of the most widely used and well-modified plastic processing equipments in plastics, pharmaceuticals, dyes and other industries. Such as plastic modified coloring, resin, color masterbatch and calcium carbonate additives, polytetrafluoroethylene (Teflon) filled masterbatch, etc., is one of the necessary equipment for profiles, pipes, building materials, chemicals and other industries.
Plastic mixer features:
A1: The main shaft seal adopts PTFE seal sleeve, skeleton oil seal and air pressure three-way seal to ensure no leakage.
A2. A plane bearing specially designed to withstand the axial force is added to the rotating structure of the main shaft, thereby avoiding the premature damage of the upper end bearing simultaneously bearing the radial force and the axial force, thereby greatly prolonging the service life of the machine.
A3. The bearing is installed with a special heating installation tool to ensure that the inner and outer rings of the bearing move at the same time. The conventional method of hammering the outer ring or the inner ring of the bearing is avoided, so that the ball is stressed during the assembly process and the bearing life is severely shortened.
A4. The design of the discharge part structure is designed according to the characteristics of the solid material. The installation of the discharge air blowing device overcomes the shortcomings of the traditional liquid design and avoids the defects of easy leakage.
A5. Both the paddle and the pulley pass the balance test, so that the machine runs without vibration.
A6. Hot mixing has a heating function of self-friction and electric heating.
A7. The lid is double-sealed and not leaking. The shear-sensitive crystalline powder is mixed in batches and the liquid is mixed into the solid.
A8. The discharge valve is plugged with a plunger type. The inner surface of the door block is closely matched with the inner wall of the container, and there is no dead zone of the mixture, so that the materials are evenly mixed.
A9: The cold machine blades use large angled blades to force the material to rise along the inner wall of the container and return to the cooling jacket for cooling purposes.
A10: Optional variable frequency speed regulation to protect the motor and power supply line, while saving 20-25%.
Details specification pictures of Plastic mixing machine:
Technical date of Plastic mixing machine:
Vertical type:
Model | SRL-Z100/200 | SRL-Z200/500 | SRL-Z300/600 | SRL-Z500/1000 | SRL-Z800/1600 |
Total volume | 100/200 | 200/500 | 300/600 | 500/1000 | 800/1600 |
Effective volume | 75/160 | 150/320 | 225/400 | 375/650 | 600/1050 |
Blade rotation speed | 650/130/180 | 475/950/130 | 475/950/60 | 430/860/60 | 370/740/50 |
Heat-cooling method | Electric/self-friction/water cooling | ||||
Mixing time | 6-10 | 6-10 | 6-10 | 6-10 | 8-12 |
Motor power | 14/22/7.5 | 30/42/7.5 | 40/55/11 | 55/75/11 | 110/30 |
Horizontal type:
Model | SRL-W500/1600 | SRL-W800/2000 | SRL-W800/2500 | SRL-W800*2/4000 |
Total volume | 500/1600 | 800/2000 | 800/2500 | 1600/4000 |
Effective volume | 330/1000 | 560/1400 | 600/1500 | 1120/2700 |
Blade rotation speed | 430/860/70 | 330/660/55 | 330/660/60 | 350/700/65 |
Heating/cooling manner | Self-friction/water cooling | |||
Mixed time(min) | 8-12 | 8-12 | 8-12 | 8-12 |
Pre-sale service:
1. Receive your daily calls and visits, and record your needs information in detail.
You can get in touch with us by calling the company, sending us a consultation email, sending an inquiry, faxing, talking to our service staff directly on the website or leaving a message. In general, we will be within 1 hour. Give you a reply.
2, according to your request, arrange a professional sales manager, discuss the requirements and goals of the equipment in detail, and make a preliminary budget and quotation.
3. We provide customized services for extrusion equipment. According to your requirements, we can conduct further technical discussions. Our professional technicians are responsible for evaluating or designing the entire project, correcting the corresponding parameters and data, and providing preliminary plans and budget quotes.
4. Our sales and technical personnel will confirm the parameters and price of the equipment with you and sign the equipment purchase contract.
In-sale service:
1. The production order will be dispatched promptly within one day after the contract takes effect, and the customer will be notified.
2. During the production process, the production department regularly schedules progress and quality inspections. The sales manager will report the production status of the equipment to the customer from time to time, and the customer can also ask the sales manager about the situation at any time.
3. After the equipment is completed, the sales manager will inform the customer in time to arrange the test machine inspection and delivery.
After sales service:
The complete plastic extrusion production line sold by Beisu Machinery can guide the installation, commissioning equipment and maintenance and operation personnel training for the user; and provide relevant technical requirements for equipment installation and use, process layout drawings, etc., and provide maintenance and accessories for life. The specific measures are as follows:
1. Equipment guidance installation and commissioning: assist and guide users to coordinate the layout of equipment according to the actual situation, reasonably arrange the planning of the overall installation location, assign technical personnel to guide equipment installation, auxiliary facilities production, and provide users with relevant questions and answers.
2. Operation and maintenance personnel training: The company can provide operation and maintenance personnel training according to user requirements.
A. Equipment production location training: Users can send operation and maintenance personnel to the company to study and receive training. The company's engineering and technical personnel will start with the theory of equipment structure, working principle, installation and commissioning technical requirements, operation, maintenance and repair procedures, and assemble and debug the equipment through the production site to understand the structure and performance of the equipment, and basically master the maintenance and repair. Operating procedures.
B. Installation and commissioning on-site training: When the company installs and debugs equipment for users, the user can send personnel to participate. Through the on-site guidance and training of the installation and commissioning personnel, the operation and maintenance personnel can master the essentials to meet the production requirements.
3. The warranty period of the company's products is one year. During the warranty period, the user is provided with free parts for equipment damage. Maintenance and spare parts supply will be provided for a long time at the cost price outside the warranty period, and will be delivered to the user at the fastest speed according to the user's request. Once the equipment fails, the user is unable to eliminate it. The company will dispatch personnel according to the user's request to rush to the scene as soon as possible, and promptly solve the problem for the user to resume production.
4. The company will keep pace with the times, develop and innovate, continuously research and develop new technologies and new products, and actively improve and improve the structure, performance and quality of existing products to meet the needs of users. When the product is updated and there are major improvements, the company will provide information to the user in a timely manner. According to the user's requirements, the company can provide equipment modification to meet the requirements at the cost price. The company is guaranteed by the company's credit, and will provide users with quality after-sales service in a serious and responsible manner, providing a strong guarantee for the normal production of users.
1. Delivery method: delivery by the supplier factory, simple packaging of domestic customers' films, wooden packaging of foreign customers.
2. Mode of transportation: The supplier shall charge the consignment, and the expenses shall be borne by the acquirer.
3. Payment method: The buyer must prepay 30% of the total equipment to the supplier as a deposit; 70% of the total equipment will be paid before the equipment is processed; the equipment arrives at the demanding factory after commissioning.
4, quality assurance: equipment quality warranty period is one year.
5. Related after-sales service
a) Provide on-site installation instructions
b) Responsible for on-site commissioning of equipment (users provide room and board for commissioning personnel)
c) Responsible for pre-employment operation and maintenance training for the demand side personnel
d) Long-term guarantee of spare parts supply
e) Long-term technical advisory services
6. Delivery time: After the contract is signed and the deposit of the purchaser is received, the processing and production of the equipment is completed within 30 working days and the delivery conditions are met. (The factory only needs 3-7 working days for stocking).
Contact Person: Mr. Batsita
Tel: 86-13913294389
Fax: 86-512-58968376