|
Product Details:
Payment & Shipping Terms:
|
Material: | Pvc Powder With Caco3 | Model: | Heating Mixer |
---|---|---|---|
Mixer Model: | SHR-25 | Heating Mixermotor Power: | 7.5Kw |
Inverter Brand: | ABB | Temperature Control Brand: | OMRON |
Capacity: | 50Kg/h | Voltage: | 380V/3phase/50HZ(optinal) |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | ||
Highlight: | industrial mixer machine,plastic mixture machine |
SHR-25L laboratory equipment high speed mixer for pvc powder with Caco3
Product description:
1. High speed mixer is apply for mixing ,coloring and drying of various resin such as poly, PE,PP,PVC polypropylene, poly chloride etc., and in the process of drying and volatilization of engineering plastic such as ABC, PC, etc. Before forming and processing as well in the mixing of phenolic resin.
2.The unit is developed by importing ,and absorbing advanced technology. By adopting PLC control ,it features high automatic level, good mixing effect, complete function, compact structure and beautiful appearance. It is an ideal equipment for plastic mixing .
Features Specifications:
1. For model smaller than 500litre model, the mixer barrel adopts 5mm stainless steel, bottom adopts 6mm stainless steel, it's stronger and durable.
2. The mixer exhausing filter adopts very good air filter used for car, the air exhausting effect is much more better than cloth bag filter.
3. Hot mixer blades are well designed which can save mixing time by 2mintues for one batch.
4. Adopts imported Germany oil seal, make sure no oil leakge and lasting long time.
Main technical parameter:
Model | SH-100 | SH-200 | SH-300 | SH-500 | SH-800 |
Pot volume (L) | 100 | 200 | 300 | 500 | 800 |
Motor power(KW) | 14/22 | 30/42 | 40/50 | 47/67 | 60/90 |
Paddle Speed | 650/130 | 475/950 | 475/950 | 430/860 | 370/740 |
Heating method | Electric and self-friction | ||||
Mixing time(min) | 8-10 |
Details specification pictures mixer:
BEISU Machinery:
BEISU machinery and equipment recommendation: PVC/PE/PP pipe production line, PVC/PE wood plastic production line, PVC profile/profile production line, PVC/PP/PE/ABS sheet/sheet production line, PVC edge band production line and mill, High-speed mixer (group), crusher, sharpener, shredder, tractor, winder, cutting machine and other plastic auxiliary machinery.
Why choose BEISU Machinery:
A1:Plant construction, renovation plan, pipeline laying plan in the plant, construction plan of circulating cooling pool
A2:Supply of raw materials, transformers, air compressors and other procurement plans
A3:Provide relevant raw material specific formula, high quality raw material suppliers, raw material cost accounting
A4:Installation equipment, commissioning equipment, training staff, and provide technical support throughout the year
A5:BEISU company has a plastics industry engineering alliance nationwide, in the case of distance, can provide relevant talents in your company year-round work, as a technology backing
Service:
Pre-sale service:
1. Receive your daily calls and visits, and record your needs information in detail.
You can get in touch with us by calling the company, sending us a consultation email, sending an inquiry, faxing, talking to our service staff directly on the website or leaving a message. In general, we will be within 1 hour. Give you a reply.
2, according to your request, arrange a professional sales manager, discuss the requirements and goals of the equipment in detail, and make a preliminary budget and quotation.
3. We provide customized services for extrusion equipment. According to your requirements, we can conduct further technical discussions. Our professional technicians are responsible for evaluating or designing the entire project, correcting the corresponding parameters and data, and providing preliminary plans and budget quotes.
4. Our sales and technical personnel will confirm the parameters and price of the equipment with you and sign the equipment purchase contract.
In-sale service:
1. The production order will be dispatched promptly within one day after the contract takes effect, and the customer will be notified.
2. During the production process, the production department regularly schedules progress and quality inspections. The sales manager will report the production status of the equipment to the customer from time to time, and the customer can also ask the sales manager about the situation at any time.
3. After the equipment is completed, the sales manager will inform the customer in time to arrange the test machine inspection and delivery.
After sales service:
The complete plastic extrusion production line sold by Beisu Machinery can guide the installation, commissioning equipment and maintenance and operation personnel training for the user; and provide relevant technical requirements for equipment installation and use, process layout drawings, etc., and provide maintenance and accessories for life. The specific measures are as follows:
1. Equipment guidance installation and commissioning: assist and guide users to coordinate the layout of equipment according to the actual situation, reasonably arrange the planning of the overall installation location, assign technical personnel to guide equipment installation, auxiliary facilities production, and provide users with relevant questions and answers.
2. Operation and maintenance personnel training: The company can provide operation and maintenance personnel training according to user requirements.
A. Equipment production location training: Users can send operation and maintenance personnel to the company to study and receive training. The company's engineering and technical personnel will start with the theory of equipment structure, working principle, installation and commissioning technical requirements, operation, maintenance and repair procedures, and assemble and debug the equipment through the production site to understand the structure and performance of the equipment, and basically master the maintenance and repair. Operating procedures.
B. Installation and commissioning on-site training: When the company installs and debugs equipment for users, the user can send personnel to participate. Through the on-site guidance and training of the installation and commissioning personnel, the operation and maintenance personnel can master the essentials to meet the production requirements.
3. The warranty period of the company's products is one year. During the warranty period, the user is provided with free parts for equipment damage. Maintenance and spare parts supply will be provided for a long time at the cost price outside the warranty period, and will be delivered to the user at the fastest speed according to the user's request. Once the equipment fails, the user is unable to eliminate it. The company will dispatch personnel according to the user's request to rush to the scene as soon as possible, and promptly solve the problem for the user to resume production.
4. The company will keep pace with the times, develop and innovate, continuously research and develop new technologies and new products, and actively improve and improve the structure, performance and quality of existing products to meet the needs of users. When the product is updated and there are major improvements, the company will provide information to the user in a timely manner. According to the user's requirements, the company can provide equipment modification to meet the requirements at the cost price. The company is guaranteed by the company's credit, and will provide users with quality after-sales service in a serious and responsible manner, providing a strong guarantee for the normal production of users.
1. Delivery method: delivery by the supplier factory, simple packaging of domestic customers' films, wooden packaging of foreign customers.
2. Mode of transportation: The supplier shall charge the consignment, and the expenses shall be borne by the acquirer.
3. Payment method: The buyer must prepay 30% of the total equipment to the supplier as a deposit; 70% of the total equipment will be paid before the equipment is processed; the equipment arrives at the demanding factory after commissioning.
4, quality assurance: equipment quality warranty period is one year.
5. Related after-sales service
a) Provide on-site installation instructions
b) Responsible for on-site commissioning of equipment (users provide room and board for commissioning personnel)
c) Responsible for pre-employment operation and maintenance training for the demand side personnel
d) Long-term guarantee of spare parts supply
e) Long-term technical advisory services
6. Delivery time: After the contract is signed and the deposit of the purchaser is received, the processing and production of the equipment is completed within 30 working days and the delivery conditions are met. (The factory only needs 3-7 working days for stocking).
Contact Person: Mr. Batsita
Tel: 86-13913294389
Fax: 86-512-58968376